CERTANIA natureOffice
Network ID DE-077-158725DEEN
Voluntary project contributions · Overview

mbw Vertriebges. mbH

Sum of the documented project contributions

€11,283.19

The sum is the total of the documented voluntary project contributions that support projects. It is not set against the emissions of the company or of individual products.

Documented individual contributions
158
Supported projects
12
Period
2019–2026
Network ID
DE-077-158725

What this page shows — and what it does not

  1. The documented project contributions are voluntary payments supporting selected climate protection measures outside the company's own value chain.
  2. The CO₂e-based reference quantities are not set against a Product Carbon Footprint, a Corporate Carbon Footprint or any other emissions.
  3. The contributions support no statement that a product, a brand or the company is climate neutral, CO₂-neutral, climate-friendly or reduced in emissions.

Documentation note

This page serves documentation purposes only. It is not a certification, not an award and not a statement of environmental quality.

Contributions from the previous documentation system

These contributions were booked before the move to the current system. Everything recorded at the time is shown here.

Timeline

Project contributions per year

Total per booking year · figures in €

The figure shown is the sum of the voluntary project contributions documented in that year. Contributions are assigned by booking date. The amounts do not represent avoided, reduced or compensated emissions.

Project overview

The supported projects

The overview lists every project to which at least one documented individual contribution is assigned in the period shown.

Combined project Germany plus, Forest Ecology in Germany & Hydropower

Documented in tracking since
2024
Project ID
600
Project standard
Gold Standard

40.40 MW Wind Energy Project by Ruchi Soya – Electricity from wind instead of coal

Renewable wind energy, Ruchi Soya

Documented in tracking since
2026
Project ID
180
Project standard
Verified Carbon Standard (VCS)

Combined project Germany & Togo plus, forest ecology in Germany, Project Togo in West Africa & solar power in India

Compensate once, triple the impact. Your CO₂ compensation does more than just offset: with our combined project, you support three climate protection measures at the same time. The principle is simple: your emissions are offset through a certified solar energy project in India. In addition, funds flow into regional forest projects in Germany and our PROJECT TOGO. Germany Plus – Climate protection on our doorstep: Together with local foresters, we are strengthening forests that are already suffering from climate change. From reforesting damaged areas to renaturalising streams, we are creating robust mixed forests for future generations. Togo Plus – Development with vision: Our own PROJECT TOGO combines climate protection with social development. With wells for clean water, efficient stoves and women's cooperatives, we create real prospects locally. Your advantages: Maximum impact per euro invested with visible, traceable projects here and there. This is how your compensation becomes a real climate impact.

Documented in tracking since
2025
Project ID
605
Project standard
Gold Standard & Waldökologieprojekte in Deutschland & Naturwaldaufforstung in Togo

Combined project TOGO plus | Recycling Togo & Hydropower

The combined Togo plus project will enable you to have a regional commitment in Togo, West Africa, in the Sokodé and Agou regions, combined with certified climate protection projects to reduce CO2 emissions. Through this combination of certified climate protection projects and regional climate and environmental protection measures developed by natureOffice CO2 combined climate protection certificates. While the actual offsetting of your emissions will take place via Toyola Cookstove, Gold Standard, Togo Plus will also help you with your important work in Togo, West Africa.

Documented in tracking since
2024
Project ID
237
Project standard
Gold Standard

Kombi: Deutschland plus Mix

Deutschland plus Mix + PROJECT TOGO verbindet Naturwaldaufforstung mit Waldökologieprojekten in Deutschland. Augenmerk liegt bei PROJECT TOGO neben der Aufforstung auf den Bereichen Bildung, Wasser, Energie, Arbeit und Gesundheit. Project Togo stärkt den Standort und bietet der lokalen Bevölkerung langfristige Perspektiven. Das regionale Engagement in Deutschland wird über einen zusätzlichen Geldbetrag, der zu 100 % an das Bergwaldprojekt e.V. fließt und somit ergänzende Umwelt- und Klimaschutzprojekte ermöglicht, abgedeckt.

Documented in tracking since
2022
Project ID
414
Project standard
Waldökologieprojekte + Naturwaldaufforstung

Wasserkraftwerk am Fluss Kemphole, Indien

Documented in tracking since
2023
Project ID
283
Project standard
Wasserkraftwerk am Fluss Kemphole, Indien

Deutschland Plus Mix

Deutschland Plus wurde von natureOffice als Kombi-Zertifikat entwickelt. Dieses Projekt zeichnet sich dadurch aus, dass es die CO2-Bindung oder Vermeidung durch internationale Gold Standard und VCS Projekte deckt und zusätzlich mit einer nationalen Naturprämie für deutsche Wälder und Moore verbindet. Das regionale Engagement wird über einen zusätzlichen Geldbetrag, der zu 100 % an das Bergwaldprojekt e.V. fließt und somit ergänzende Umwelt- und Klimaschutzprojekte ermöglicht, abgedeckt.

Documented in tracking since
2021
Project ID
401
Project standard
Waldschutz & Waldökologie

PROJECT TOGO

PROJECT TOGO works directly with the local people on-site - from the establishment of nurseries, the cultivation of indigenous tree species, the implementation of firebreaks and protective hedges to the care, monitoring and management of forests and arable land as well as additional infrastructure measures. The focus is on education, water, energy, jobs and health. Project Togo empowers the area and offers the local population long-term prospects.

Documented in tracking since
2022
Project ID
400
Project standard
Naturwaldaufforstung

TOGO plus plastic recycling project

Documented in tracking since
2023
Project ID
285
Project standard
Hydropower plant (CDM/CER) plus plastics recycling project in Togo

Wasserkraft Kinnaur Karcham Wangtoo

Der Sutlej River entspringt in Tibet in der Nähe des 6.714 m hohen Berges Kailash im Himalaya. Das Wasserkraftprojekt Karcham-Wangtoo bildet einen Teil eines Gesamtplans für die Entwicklung des Wasserkraftpotenzials des Sutlej- Einzugsgebiets. Die Projektaktivität wurde entwickelt, um den akuten Mangel an Stromerzeugungskapazität in der nördlichen Region Indiens.

Documented in tracking since
2021
Project ID
404
Project standard
Wasserkraft

PROJECT TOGO

PROJECT TOGO works directly with the local people on-site - from the establishment of nurseries, the cultivation of indigenous tree species, the implementation of firebreaks and protective hedges to the care, monitoring and management of forests and arable land as well as additional infrastructure measures. The focus is on education, water, energy, jobs and health. Project Togo empowers the area and offers the local population long-term prospects.

Documented in tracking since
2021
Project ID
200
Project standard
Naturwaldaufforstung

Deutschland plus Amrum

With the help of the mountain forest project, the unstable forest on the island, which is surrounded by the Schleswig-Holstein Wadden Sea National Park, is being converted into a stable mixed-use landscape. In the future, the protection forest will mainly consist of local deciduous trees adapted to the climate, and the proportion of softwood (previously 90%) will decrease sharply in the coming years. Biodiversity is gradually increasing, creating a species-rich and structurally rich forest.

Documented in tracking since
2019
Project ID
207
Project standard
Waldökologie + Naturwaldaufforstung
Booking overview

Documented individual contributions

The overview brings together every individual contribution documented in the network. Each individual documentation can be opened separately via its record ID.

Booking dateRecord IDProject contributionSupported project
07/31/2026381-1673-883€79.17Combined project Germany plus, Forest Ecology in Germany & Hydropower
07/31/2026378-1673-776€46.32Combined project Germany plus, Forest Ecology in Germany & Hydropower
07/31/2026375-1673-584€46.32Combined project Germany plus, Forest Ecology in Germany & Hydropower
07/31/2026371-1673-092€138.72Combined project Germany plus, Forest Ecology in Germany & Hydropower
06/04/2026387-1616-744€87.78Combined project Germany plus, Forest Ecology in Germany & Hydropower
04/23/2026510-1574-941€76.44Combined project Germany plus, Forest Ecology in Germany & Hydropower
01/07/2026468-1468-802€16.6340.40 MW Wind Energy Project by Ruchi Soya – Electricity from wind instead of coal
01/07/2026467-1468-781€15.0840.40 MW Wind Energy Project by Ruchi Soya – Electricity from wind instead of coal
01/07/2026466-1468-392€15.2840.40 MW Wind Energy Project by Ruchi Soya – Electricity from wind instead of coal
01/07/2026465-1468-828€14.7140.40 MW Wind Energy Project by Ruchi Soya – Electricity from wind instead of coal

Basics & classification

How to read this project contribution correctly

Types of project support

Certificate-based project support

Support of a climate protection project with project units. The project standard and registry ID are documented.

Direct project support

Support of a specific ecological, social or combined measure. No particular CO₂e effect is stated.

Further information

Detailed information is available in the natureOffice documentation framework.

View the documentation framework →

Legal classification

What EmpCo permits

Investments in environmental initiatives may be communicated factually. A project contribution does not have to be certificate-based.

The important limit

No neutral, reduced or positive climate effect of a product may be derived from the project support.

Application

The new rules apply from 27 September 2026.

Notes on communication

Information instead of promised effects

Communicate only the documented facts: project, project type, period and available records.

Keep them apart

A CO₂ balance, a company's own reductions and voluntary project contributions should be presented separately.

Better avoided

Terms such as “climate neutral”, “CO₂-neutral” or “balanced” in connection with project support.