CERTANIA natureOffice
Network ID DE-077-367729DEEN
Voluntary project contributions · Overview

Druck- und Verlagshaus Zarbock GmbH & Co. KG

Sum of the documented project contributions

€309,555.00

The sum is the total of the documented voluntary project contributions that support projects. It is not set against the emissions of the company or of individual products.

Documented individual contributions
8
Supported projects
4
Period
2020–2026
Network ID
DE-077-367729

What this page shows — and what it does not

  1. The documented project contributions are voluntary payments supporting selected climate protection measures outside the company's own value chain.
  2. The CO₂e-based reference quantities are not set against a Product Carbon Footprint, a Corporate Carbon Footprint or any other emissions.
  3. The contributions support no statement that a product, a brand or the company is climate neutral, CO₂-neutral, climate-friendly or reduced in emissions.

Documentation note

This page serves documentation purposes only. It is not a certification, not an award and not a statement of environmental quality.

Contributions from the previous documentation system

These contributions were booked before the move to the current system. Everything recorded at the time is shown here.

Timeline

Project contributions per year

Total per booking year · figures in €

The figure shown is the sum of the voluntary project contributions documented in that year. Contributions are assigned by booking date. The amounts do not represent avoided, reduced or compensated emissions.

Project overview

The supported projects

The overview lists every project to which at least one documented individual contribution is assigned in the period shown.

Combined project Germany plus, Forest Ecology in Germany & Hydropower

Documented in tracking since
2024
Project ID
600
Project standard
Gold Standard

Bujagali Hydropower

The Bujagali power station is a hydroelectric power station on the Victoria Nile which produces energy at the Bujagali waterfall in Uganda. Construction was completed in 2012. The capacity of the power station is 250 megawatts (340,000 hp). The station is one of the most powerful hydroelectric power stations in Uganda. Hydropower is a form of renewable energy since no CO2 emissions are emitted as a result of direct operation (compared to thermal power stations which use fossil fuels).

Documented in tracking since
2022
Project ID
108
Project standard
VCS/CDM

Wind energy project Karas, Namibia

Documented in tracking since
2021
Project ID
196
Project standard
Verified Carbon Standard (VCS)

Togo plus Hydroelectric Kinnaur

Documented in tracking since
2020
Project ID
258
Project standard
Naturwaldaufforstung & Hydropower
Booking overview

Documented individual contributions

The overview brings together every individual contribution documented in the network. Each individual documentation can be opened separately via its record ID.

Booking dateRecord IDProject contributionSupported project
06/11/2026240-1623-786€35,550.00Combined project Germany plus, Forest Ecology in Germany & Hydropower
11/24/2025464-1257-911€61,080.00Combined project Germany plus, Forest Ecology in Germany & Hydropower
10/27/2024688-1031-831€42,780.00Combined project Germany plus, Forest Ecology in Germany & Hydropower
08/27/2024502-0970-700€18,000.00Combined project Germany plus, Forest Ecology in Germany & Hydropower
06/01/2023DE-140-856631€41,088.00Bujagali Hydropower
06/01/2022DE-140-856630€37,568.00Bujagali Hydropower
12/20/2021DE-140-856629€44,262.00Wind energy project Karas, Namibia
06/01/2020DE-140-856628€29,227.00Togo plus Hydroelectric Kinnaur
Basics & classification

How to read this project contribution correctly

Types of project support

Certificate-based project support

Support of a climate protection project with project units. The project standard and registry ID are documented.

Direct project support

Support of a specific ecological, social or combined measure. No particular CO₂e effect is stated.

Further information

Detailed information is available in the natureOffice documentation framework.

View the documentation framework →

Legal classification

What EmpCo permits

Investments in environmental initiatives may be communicated factually. A project contribution does not have to be certificate-based.

The important limit

No neutral, reduced or positive climate effect of a product may be derived from the project support.

Application

The new rules apply from 27 September 2026.

Notes on communication

Information instead of promised effects

Communicate only the documented facts: project, project type, period and available records.

Keep them apart

A CO₂ balance, a company's own reductions and voluntary project contributions should be presented separately.

Better avoided

Terms such as “climate neutral”, “CO₂-neutral” or “balanced” in connection with project support.